KPI Green Energy secures 4.20 MW wind-solar hybrid power project

KPI Green Energy secures 4.20 MW wind-solar hybrid power project

KPI Green has received a new order for executing wind-solar hybrid power project of 4.20 MW.

This includes 4.20 MW wind turbine and three MWdc solar capacity.

The order has been received from Nouveau Jewellery, Surat under Captive Power Producer (CPP)' business segment.

here is company details.

 

NOTE :You need to login first to access this feature.

Leave a Reply

Your email address will not be published. Required fields are marked *